Plasterboard, plastering and painting
from a single point of contact

We take the entire finishing stage off your hands, from the first joint to the final coat of paint. One schedule, one point of contact and one party accountable for the end result.

Or call +31 6 2823 0700

Reply within one working day

  • VCA certified
  • Plasterboard in level A, B or C
  • Aligned with your construction schedule
  • One point of contact for all trades

Three trades, one party

Finishing, plastering and painting all run to one schedule. No coordinating three subcontractors and no argument over who is responsible for what.

Finishing level agreed in advance

Level A, B or C is set out in writing in the quotation, so at handover the result can be checked objectively, no interpretation after the fact.

Fixed price, extras agreed first

After the site survey you receive a fixed price per item. Additional work is always confirmed in writing beforehand, so your budget holds.

Work from our latest handovers

Services

We handle the complete finishing

From plasterboard finishing to final paintwork. You can engage us per discipline, but the full package gives the shortest lead time and the least coordination.

Plasterboard finishing, Skyline Afbouw
Plasterboard finishing Core activity

Joints, corners and screw holes in level A, B or C

Our core activity. For plasterboard, Dutch construction distinguishes three finishing levels; we work to that classification. The required level is agreed in advance, so at handover it can be objectively verified.

Traditional plastering

Smooth plaster and decorative renders

Traditional plastering for walls and ceilings, in both new build and renovation. Smooth plaster, decorative renders and repair work, carried out by experienced plasterers and fully scheduled by us.

Traditional plastering, Skyline Afbouw
Painting, Skyline Afbouw
Painting

Final finish in the colour of your choice

The closing stage of the finishing works. Walls, ceilings, frames and woodwork. Because we supply the substrate ourselves, we know exactly what the paintwork still needs, and it connects seamlessly.

Plasterboard installation Coming soon

Metal Stud and plasterboard, coming soon

We are expanding our services with installation, so the wall structure can be handled by us as well. Is your project running on short notice? Get in touch and we will discuss what is already possible.

Plasterboard installation, Skyline Afbouw
Plasterboard finishing

Finishing level A, B or C

"Neatly finished" is not a measurable requirement. That is why we agree the finishing level in advance, so at handover you can objectively verify that the result matches the order.

Applies to plasterboard

This classification belongs to the finishing of plasterboard: closing joints, corners and screw holes. Traditional plastering, painting and stud work do not use these levels, for those we agree the required quality separately, per project.

C Fire rating

Closed

The boards are fitted and the joints are closed. This level is intended for fire resistance and a closed structure, not as visible work.

Finishing level33%
  • Fire-rated partitions
  • Service rooms and shafts
  • Behind stud walls
  • Non-visible building elements
B Most applied

Standard

The standard in residential and commercial construction. The wall is smooth and ready for paint or wallpaper. Under sharp raking light the joint may remain slightly perceptible.

Finishing level66%
  • Wall paint and wallpaper
  • Housing and offices
  • Bedrooms, hallways, storage
  • Regular renovations
A Highest level

Mirror smooth

Skimmed over the full surface and machine sanded. Even under raking light or with gloss paint the surface stays free of visible joints or screw holes. Requires more time and material.

Finishing level100%
  • Large glass facades and raking light
  • Gloss paint and lacquer
  • Representative spaces
  • High-end finishing

Not sure? Level B is sufficient for most projects. Level A is worth considering with large glass facades, raking light or gloss paint. On request we advise per room or building element.

Request advice
Why Skyline

Finishing is the final phase - nothing may go wrong there

It is precisely in the finishing phase that the pressure lands on the schedule. Our way of working is set up to keep that phase manageable.

Quality agreed in advance

For plasterboard finishing we agree the level, A, B or C, per room or building element in advance. That makes it objectively verifiable at handover whether the result matches the order.

Aligned with your schedule

We link our planning to your construction schedule and communicate in good time if anything shifts, so the next discipline is not left waiting.

One point of contact

Finishing, plastering and painting all run through one party. That saves coordination, part invoices and discussion about responsibility.

Fixed price, no surprises

After the survey you receive a fixed price per item. Additional work is always confirmed in writing beforehand, including the effect on the schedule.

Left broom clean

Low-dust working, materials removed and floors left broom clean. The next team can continue straight away.

Short lines

You are in direct contact with the people doing the work. No call centre and no chain of intermediaries.

VCA certified

We work according to the VCA system for safety, health and environment on site. Certificates are sent on request in advance.

Projects

Completed projects

Recently completed work, finished entirely by us. Select a photo to view the full series.

Klasse A Villabouw

Naastgelegen villa in Holten

De kleinere woning direct naast het hoofdgebouw, onderdeel van hetzelfde ensemble van drie panden. Ook hier verzorgden wij de complete afwerking in klasse A, in één doorlopende planning met de grote villa.

Location
Holten
Finishing class
A
Completed
2026
Photos to follow Images of this project will be added shortly. Finishing level A
Klasse A Villabouw

Villa in Holten

Vrijstaande villa van circa 700 tot 900 m², volledig door ons afgewerkt in klasse A. Wanden en plafonds zijn volvlaks geplamuurd en stofarm geschuurd, zodat het werk ook onder strijklicht en bij glansverf vlak blijft.

Location
Holten
Size
circa 700 – 900 m²
Finishing class
A
Completed
2026

A comparable project in preparation? We are glad to think along on the approach and, for plasterboard, on the finishing level per room.

Submit a similar project
Process

From request to handover

Six steps with a clear lead time, so you always know where the project stands.

01

Request

Within 1 working day

You send the drawings or submit the project through the form. We confirm receipt and ask any additional questions.

02

Survey and advice

2–5 working days

We visit the site, take measurements and advise on the phasing and a realistic lead time. For plasterboard finishing we determine the level per room together.

03

Quotation

Within 3 working days

You receive a specification per item and per m², clearly stating what is and is not included.

04

Scheduling

By arrangement

Once agreed we link our planning to your construction schedule and reserve the required capacity.

05

Execution

Project dependent

The work is carried out in line with the quotation, and for plasterboard finishing to the level recorded. On multi-day projects you receive interim progress updates.

06

Handover

On completion

Joint inspection against the order, and for plasterboard finishing against the recorded level. Any remaining items are resolved within five working days.

Working area

Based in Heelsum, active throughout the Netherlands

Our home base is Heelsum. In Gelderland and Utrecht we are quickly on site; beyond that we work throughout the Netherlands, depending on the size and lead time of the project.

Heelsum Arnhem Wageningen Ede Oosterbeek Veenendaal Nijmegen Rhenen Doorwerth Bennekom

Do we work in your region?

Enter the postcode of the project for an immediate indication.

Groningen, by arrangement Friesland, by arrangement Drenthe, by arrangement Overijssel, by arrangement Flevoland, by arrangement Gelderland, quickly on site Utrecht, quickly on site Noord-Holland, by arrangement Zuid-Holland, by arrangement Zeeland, by arrangement Noord-Brabant, by arrangement Limburg, by arrangement Heelsum Nijmegen Utrecht Amsterdam Rotterdam Zwolle Apeldoorn Eindhoven Groningen
Quickly on site By arrangement Home base
Questions

Frequently asked questions

These levels belong to plasterboard finishing; they do not exist for traditional plastering or painting. Level C means the boards are closed for fire resistance; this is not visible work. Level B is the standard in residential and commercial construction: smooth and ready for paint, though the joint may remain slightly perceptible under sharp raking light. Level A is skimmed over the full surface and stays flat even under raking light or gloss paint. For most projects level B is sufficient.

We focus on contractors, property developers and construction companies. Private commissions are accepted by arrangement, usually for larger renovations or complete floors.

Yes, both are part of our package. You arrange it through us, with one schedule and one point of contact. Because we supply the substrate ourselves, the paintwork connects to it seamlessly.

We are in the process of adding this service. For projects on short notice we are happy to discuss what is already possible, please get in touch.

We do not issue prices through a web form. After your request we will contact you and, if desired, schedule a survey. You then receive a fixed price, specified per item. Additional work is always confirmed in writing beforehand.

That depends on the surface area, the type of work and the phasing on site. For plasterboard finishing the level weighs heavily: level A takes considerably more time than level B because of the extra skimming and sanding pass. The quotation includes a concrete indication in working days.

Our home base is Heelsum. In Gelderland and Utrecht we are quickly on site; beyond that we work throughout the Netherlands, depending on the size and lead time of the project.

Yes. We are VCA certified according to the system for safety, health and environment on construction sites. The certificate is sent in advance on request, for instance for your site induction or project file.

Sanding inevitably produces dust. We mask off, work with as little dust as possible, remove our materials and leave the floor broom clean so the next discipline can continue immediately.
Tradespeople wanted

Working with Skyline

We are expanding our network and work exclusively with self-employed tradespeople. We do not offer employment: you work as a freelancer or subcontractor, per project or on an ongoing basis. Looking for work you can count on? We would be glad to talk.

Plasterboard finishers

Joints, corners and screw holes in levels A, B and C. Per project or ongoing, always on a self-employed basis.

Self-employed only · Gelderland region · Per project or ongoing

Plasterers

Smooth plaster, decorative renders and repair work, in new build and renovation. We handle the planning and the client; you deliver the craft.

Self-employed only · New build and renovation · Smooth plaster and render

Painters

The closing stage of the finishing works: walls, ceilings, frames and woodwork. Because we supply the substrate ourselves, you know in advance what you are starting on.

Self-employed only · Interior painting · Emulsion and gloss

Installation partners

For our expansion into plasterboard installation we are looking for tradespeople experienced in Metal Stud and board materials.

Self-employed only · Metal Stud · Short term

info@skylineafbouw.nl · Prefer to discuss by phone? +31 6 2823 0700

Contact

Send us your project

E-mail works fastest: attach your drawings or photos and we will come back with a specific response. Prefer the phone? That is of course also possible.

Skyline Afbouw aan het werk

Availability

  • Monday 07:00 – 17:00
  • Tuesday 07:00 – 17:00
  • Wednesday 07:00 – 17:00
  • Thursday 07:00 – 17:00
  • Friday 07:00 – 16:00
  • Saturday By appointment
  • Sunday · today Closed

While working on site we cannot always answer the phone. An e-mail is always answered within one working day.

Outsource your finishing to one party?

Send your drawings by e-mail or submit your project through the form. Within one working day you will know where you stand.

No obligation VCA certified Fixed price after survey One point of contact
WhatsApp
Ask a question
Light / dark
Back to top